SL-450 Applications

 

The GOMACO RC Conveyor and the SL-450 are placing and finishing a concrete lining over a plastic membrane to seal this canal in China.

 

 

 

This SL-450 with trimmer attachment was used to trim approximately 2.5 to three inches (64 to 76 mm) of sandy soil in Rio Rancho, New Mexico.

 

 

 

A contractor finishes a portion of the São Francisco Canal with their SL-450 cylinder finisher in Floresta, Brazil.

 

 

 

This SL-450 is finishing the bank of a concrete water treatment pond in Overland Park, Kansas.

 

 

 

An SL-450 is at work on the Melbourne Water Canal Project in Melbourne, Victoria, Australia.

 

 

 

This GOMACO SL-450 is finishing the concrete lining of a canal in Ankara, Turkey. The contractor also used an RC Conveyor to place the concrete down the slope of the canal.

 

 

 

The new race track at the Bristol Motor Speedway in Bristol, Tennessee, was poured in just 13 weeks with an SL-450.

Read more about this project in GOMACO World Vol. 36.1.

 

 

 

Longitudinal and transverse joints are scored with attachments on the SL-450, and laborers on the Spanit® work bridge finish the joints.

 

 

 

The SL-450 assured uniform concrete placement and slope thickness and finishes the slopes at a much faster rate than placing preformed concrete panels.

Read more about this project in GOMACO World 32.1.

 

 

 

 

 

 

 

 

 

For Additional Information

 

Cylinder Finishers Information

C-450 & SL-450 Cylinder Finisher

Photos: C-450 & SL-450

Download The Cylinder Finishers Brochure (PDF)

Download The GOMACO Full Line Brochure (PDF)